Sri Lanka Park Project
An investor from Sri Lanka purchased eight types of Yueton rides – bumper cars, flying cars, flying chairs, self-controlled airplanes, outdoor slides, roller coasters and more. The first batch was completed in 2024, with the roller coaster installation and operation finalized in 2025, supported by our engineers and project managers on site.
Project Overview
| Project | Sri Lanka Park Project |
| Location | Sri Lanka |
| Scope | 8 ride types, phased delivery |
| Model | YTW-SRI-LANKA-PARK |
| Status | Phase 1 2024; coaster operating 2025 |
Project Story
An investor from Sri Lanka purchased eight types of amusement rides from Yueton – bumper cars, flying cars, flying chairs, self-controlled airplanes, outdoor slides, roller coasters and more. The first batch of equipment was completed in 2024, with the roller coaster installation and operation finalized in 2025.
Yueton Amusement demonstrated exceptional professionalism – their engineers and project managers visited the site to assist with debugging, ensuring the smooth progress of the project. The client is extremely pleased and satisfied with the cooperation.
Equipment Delivered
Bumper Cars
Classic bumper car arena.
Flying Cars
Spinning flying car ride.
Flying Chairs
Classic spinning ride.
Self-Controlled Airplanes
Interactive flying ride.

Outdoor Slides
Family slide fun.

Roller Coaster
Coaster completed in 2025.
Sri Lanka Park Project – Frequently Asked Questions
Why were the eight ride types chosen together?
The mix covers family rides, interactive rides and a signature coaster – giving the park broad appeal across age groups from the first phase.
Why did the roller coaster open in 2025, a year after phase one?
Phased delivery: the first batch shipped in 2024, and the coaster was installed and commissioned in 2025 with engineers and project managers on site for debugging.
What did the engineers and project managers do on site?
They assisted with installation debugging and coordination, ensuring every ride was commissioned smoothly and the project stayed on schedule.
How does phased delivery work for new parks?
Phase one opens with the first ride batch while later phases (like a coaster) are delivered and commissioned as planned – spreading investment and construction over time.
How satisfied is the client?
Extremely pleased and satisfied – the client highlights Yueton’s exceptional professionalism throughout the cooperation.